Method worksheet
Work cost worksheet
A worksheet for comparing what a piece of work costs today with what it would cost with intelligent machines doing part of it, counting every cost line.
Use one role or workflow. Compare the same output, period, quality, and control level, and count every cost line: setup, data, integration, oversight, support, risk, lock-in and exit. This worksheet explains the economics method inside the AI Transformation Blueprint; it does not calculate or validate a result for you.
There are no input fields, uploads, automatic calculations, or saved estimates on this page. Print or copy the blank tables into your own working document. For every amount, record its source and mark it measured, sourced, assumed, or unknown. Leave an unknown amount blank; do not treat it as zero.
Define the comparison
| Item | Record | Source | Basis |
|---|---|---|---|
| Output | |||
| Volume | |||
| Period | |||
| Quality threshold | |||
| Control requirements |
Current work
Include people and hours at loaded labour cost, management and coordination, current software or equipment, and the costs of rework, delay, errors, downtime, and controls. Avoid counting the same cost twice.
| Cost category | Amount | Source | Basis |
|---|---|---|---|
| People and hours, at loaded labour cost | |||
| Management and coordination | |||
| Current software or equipment | |||
| Rework, delay, errors, downtime, and controls | |||
| Current annual full cost |
Proposed work
Include vendor or runtime costs, retained human work, oversight and exceptions, evaluation, security and safety controls, support, maintenance, incidents, and continuity. Account for risk, lock-in, and exit.
Separate recurring operating costs from one-time transition investment such as setup, data preparation, integration, and initial evaluation. Do not count a transition cost again in the recurring line.
| Cost category | Amount | Source | Basis |
|---|---|---|---|
| Vendor or runtime | |||
| Retained human work | |||
| Oversight and exceptions | |||
| Evaluation | |||
| Security and safety controls | |||
| Support, maintenance, incidents, and continuity | |||
| Risk | |||
| Lock-in (cost to switch vendor or method) | |||
| Exit and handover | |||
| Proposed annual full cost | |||
| One-time transition investment |
Compare like with like
Annual operating difference = current annual full cost − proposed annual full cost
Net Year-1 difference = current operating cost for the affected period − proposed operating cost for the same period − one-time transition investment
Keep annual figures in the annual comparison. For Year 1, use the same affected dates for both operating-cost estimates and record those dates and assumptions. Count transition investment once.
| Result | Formula | Amount | Basis |
|---|---|---|---|
| Annual operating difference | current annual full cost − proposed annual full cost | ||
| Net Year-1 difference | current operating cost for the affected period − proposed operating cost for the same period − one-time transition investment |
Test downside, base, and upside assumptions. A positive cost gap is one decision input, not an ROI guarantee or permission to implement. Capability, safety, workforce effects, systems fit, and change readiness still need evidence.
Use it independently
Use the worksheet in your own working document. To connect the cost comparison to job descriptions, process maps and controls, discuss a Blueprint.